# Edensor Gardens · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-edensor-gardens-uk

Edensor Gardens is an EV charging site in Barnes, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Edensor Gardens, W4 2QY
- **Area:** Barnes, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.48214, -0.25431

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 3 | Not listed |
| J-1772 | 4 kW | 3 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Edensor Gardens (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at Edensor Gardens (Total Energies)?

Up to 7 kW AC via Type 2, J-1772.

### How many charging sockets does Edensor Gardens (Total Energies) have?

3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772.

### Who operates Edensor Gardens?

Edensor Gardens is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Edensor Gardens (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Edensor Gardens (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Edensor Gardens (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Barnes](https://ampmap.co.uk/chargers/united-kingdom/greater-london/barnes)
- [Cheapest charging in Barnes](https://ampmap.co.uk/chargers/united-kingdom/greater-london/barnes/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [Outside 5-13 Grantham Road · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-outside-5-13-grantham-road-uk) - CCS 50 kW · Burlington Road
- [ubitricity Distributed Energy Systems UK Ltd. 17 Corney Road, Opposite No 17](https://ampmap.co.uk/charger/ubitricity-17-corney-road-opposite-no-17-uk) - Ubitricity · Type 2 5 kW · 17 Corney Road, Opposite No 17 · From 45p/kWh
- [Corney Road · SureCharge](https://ampmap.co.uk/charger/surecharge-corney-road-uk) - Type 2 4 kW · Corney Road
- [Paxton Road · SureCharge](https://ampmap.co.uk/charger/surecharge-paxton-road-uk) - Type 2 4 kW · Paxton Road
- [ubitricity Distributed Energy Systems UK Ltd. 59 Paxton Road, Outside No 59](https://ampmap.co.uk/charger/ubitricity-59-paxton-road-outside-no-59-uk) - Ubitricity · Type 2 5 kW · 59 Paxton Road, Outside No 59 · From 45p/kWh
- [Staveley Gardens · Total Energies](https://ampmap.co.uk/charger/total-energies-staveley-gardens-uk) - Type 2 7 kW · Staveley Gardens

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-edensor-gardens-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 27 Apr 2017).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
