Total Energies · EV charging site
Euston Station Car Park
Melton Street, Soho, NW1 2RT
Euston Station Car Park is an EV charging site in Soho, Greater London, run by Total Energies. All 6 of its sockets are 7 kW Type 2, and charging is listed as free. 213 other charging sites are listed within a mile, and the nearest site with 50 kW or more is [E-TAXI ONLY] West Bank (BP Pulse), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 5 Nov 2016)
- Phone (from Open Charge Map)
- +44 845 0774 224 APCOA (Car park operato
- Getting there
- Car park fees apply (pay on foot). Available 24 hours.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Euston Station Car Park (Total Energies)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Euston Station Car Park (Total Energies)?
Up to 7 kW AC via Type 2.
How many charging sockets does Euston Station Car Park (Total Energies) have?
6 charging sockets: 3 × 7 kW Type 2.
Who operates Euston Station Car Park?
Euston Station Car Park is on the Total Energies network. For site issues, the operator lists +44 845 0774 224 APCOA (Car park operato.
Where is the nearest charger with 50 kW or more to Euston Station Car Park (Total Energies)?
[E-TAXI ONLY] West Bank (BP Pulse) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Euston Station Car Park (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Euston Station Car Park (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Euston Station Car Park (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Gordon Street
- ubitricity Distributed Energy Systems UK Ltd. 14 Endsleigh Street
- ubitricity Distributed Energy Systems UK Ltd. 24 Doric Way, o/s St Anne's flats
- ubitricity Distributed Energy Systems UK Ltd. 6 Endsleigh Street, j/o Tavistock Square
- [E-TAXI ONLY] West Bank
- ubitricity Distributed Energy Systems UK Ltd. 39 Ossulston Street, opp.
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 14 Endsleigh Street · 56p per kWh · 5 kW · 0.2 mi
- Fastest nearby
- [E-TAXI ONLY] West Bank · 50 kW · 0.3 mi