Total Energies · EV charging site
Farm Lane
10 Farm Lane, Fulham, SW6 1PS
Farm Lane is an EV charging site at 10 Farm Lane in Fulham, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. Amp Map lists 2 other charge points named Farm Lane in Fulham. 1,568 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lille Road (Normand Park layby) (ESB Energy), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 15 Aug 2017)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Farm Lane (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Farm Lane (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Farm Lane (Total Energies) have?
2 charging sockets: 2 × 4 kW J-1772, 2 × 7 kW Type 2.
Who operates Farm Lane?
Farm Lane is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Farm Lane (Total Energies)?
Lille Road (Normand Park layby) (ESB Energy) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Farm Lane (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Farm Lane (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Farm Lane (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Walham Grove
- ubitricity Distributed Energy Systems UK Ltd. 46 Walham Grove, Outside 46
- ubitricity Distributed Energy Systems UK Ltd. 16 Walham Grove, Outside 16
- Ubitricity 21 Eustace Road
- ubitricity Distributed Energy Systems UK Ltd. 21 Eustace Road
- ubitricity Distributed Energy Systems UK Ltd. 1 Eustace Road, Outside No 1
- Cheapest nearby
- Ubitricity 21 Eustace Road · 55p per kWh · 5 kW · 160 yd