Total Energies · EV charging site
Featherstone Terrace Car Park
Featherstone Terrace, Southall, UB2 5AL
Featherstone Terrace Car Park is an EV charging site in Southall, Greater London, run by Total Energies. All 3 of its sockets are 7 kW Type 2. 26 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Heston, UK - Eastbound (Tesla), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free. Parking fees apply.(from Open Charge Map, 15 Dec 2016)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Featherstone Terrace Car Park (Total Energies)?
The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.
How fast is charging at Featherstone Terrace Car Park (Total Energies)?
Up to 7 kW AC via Type 2.
How many charging sockets does Featherstone Terrace Car Park (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2.
Who operates Featherstone Terrace Car Park?
Featherstone Terrace Car Park is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Featherstone Terrace Car Park (Total Energies)?
Heston, UK - Eastbound (Tesla) is 1 mile away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Featherstone Terrace Car Park (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Featherstone Terrace Car Park (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Featherstone Terrace Car Park (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 5 Gladstone Road
- Dudley Road
- Havelock Rd
- ubitricity Distributed Energy Systems UK Ltd. 83 Featherstone Road
- ubitricity Distributed Energy Systems UK Ltd. 105 Featherstone Road
- Grange Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 5 Gladstone Road · 45p per kWh · 5 kW · 100 yd
- Fastest nearby
- Dudley Road · 22 kW · 0.1 mi