Total Energies · EV charging site
Finchley Road
Finchley Road, Golders Green, NW11 6XL
Finchley Road is an EV charging site in Golders Green, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 29 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 20 The Market Place, Falloden Way (ESB Energy), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available. Parking fees may apply.(from Open Charge Map, 22 Aug 2017)
- Notes
- 2 IER charge points, the first on-street EV chargers in London Borough of Barnet. Tethered J1172 is limited to 16A charges.
- Getting there
- Two bays, one post each. Signage indicates 4 hours stay, no return within 2 hours. See photos.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Finchley Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Parking fees may apply.. Prices can change, so check the price at the charger before you start.
How fast is charging at Finchley Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Finchley Road (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772.
Who operates Finchley Road?
Finchley Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Finchley Road (Total Energies)?
20 The Market Place, Falloden Way (ESB Energy) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Finchley Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Finchley Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Finchley Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- hub_l002701_cs_13
- hub_l002701_cs_01
- ubitricity Distributed Energy Systems UK Ltd. 81 Templars Avenue
- ubitricity Distributed Energy Systems UK Ltd. 62 Erskine Hill
- ubitricity Distributed Energy Systems UK Ltd. 20 Erskine Hill
- hub_l002601_cs_09
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 81 Templars Avenue · 46p per kWh · 5 kW · 0.3 mi
- Fastest nearby
- hub_l002701_cs_13 · 22 kW · 0.2 mi