# Fleet Road · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-fleet-road-uk

Fleet Road is an EV charging site in Chalk Farm, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 102 Fleet Road, NW3 2QX
- **Area:** Chalk Farm, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.55354, -0.16216
- **Getting there:** South side of Fleet Road

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |
| J-1772 | 4 kW | 1 | Not listed |

- **Price:** £0.073/minute; min £1.38; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** Elektrobay classic post. seems to accept Source London cards. Due to be replaced with IER model

## Common questions

### How much does it cost to charge at Fleet Road (Total Energies)?

The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at Fleet Road (Total Energies)?

Up to 7 kW AC via J-1772, Type 2.

### How many charging sockets does Fleet Road (Total Energies) have?

1 charging socket: 1 × 4 kW J-1772, 1 × 7 kW Type 2.

### Who operates Fleet Road?

Fleet Road is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Fleet Road (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Fleet Road (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Fleet Road (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Chalk Farm](https://ampmap.co.uk/chargers/united-kingdom/greater-london/chalk-farm)
- [Cheapest charging in Chalk Farm](https://ampmap.co.uk/chargers/united-kingdom/greater-london/chalk-farm/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [Camden Ambulance Station · Hubsta](https://ampmap.co.uk/charger/hubsta-camden-ambulance-station-uk) - Type 2 4 kW · Agincourt Road
- [Constantine Road · Total Energies](https://ampmap.co.uk/charger/total-energies-constantine-road-uk) - Type 2 22 kW · 49 Constantine Road
- [Mackeson Road · Total Energies](https://ampmap.co.uk/charger/total-energies-mackeson-road-uk) - Type 2 22 kW · 2 Mackeson Road
- [ubitricity Distributed Energy Systems UK Ltd. 80 Constantine Road](https://ampmap.co.uk/charger/ubitricity-80-constantine-road-uk) - Ubitricity · Type 2 5 kW · 80 Constantine Road · From 45p/kWh
- [Lawn Road · Total Energies](https://ampmap.co.uk/charger/total-energies-lawn-road-uk) - Type 2 22 kW · 10 Lawn Road
- [Southampton Road · Total Energies](https://ampmap.co.uk/charger/total-energies-southampton-road-uk) - Type 2 22 kW · Southampton Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-fleet-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 12 May 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
