Total Energies · EV charging site
Garnet Road Car Park
Garnet Road, South Norwood, CR7 8RD
Garnet Road Car Park is an EV charging site in South Norwood, Greater London, run by Total Energies. Both of its sockets are 7 kW Type 2. 35 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Gloster, 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free. Parking fees apply.(from Open Charge Map, 5 Nov 2016)
- Notes
- Two GE durastation charge points
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Garnet Road Car Park (Total Energies)?
The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.
How fast is charging at Garnet Road Car Park (Total Energies)?
Up to 7 kW AC via Type 2.
How many charging sockets does Garnet Road Car Park (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Garnet Road Car Park?
Garnet Road Car Park is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Garnet Road Car Park (Total Energies)?
Shell Recharge Shell Gloster is 0.7 miles away in a straight line, with up to 180 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Garnet Road Car Park (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Garnet Road Car Park (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Garnet Road Car Park (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Woodville Road
- The Drive
- Brook Road
- ubitricity Distributed Energy Systems UK Ltd. 2 Zermatt Road, Side of 13 Lucerne Road
- Brook Road
- Heath Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 2 Zermatt Road, Side of 13 Lucerne Road · 56p per kWh · 5 kW · 0.2 mi
- Fastest nearby
- Woodville Road · 22 kW · 0.2 mi