# Garnham Close · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-garnham-close-uk

Garnham Close is an EV charging site in Stamford Hill, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Garnham Close, N16 7JB
- **Area:** Stamford Hill, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.56249, -0.07302
- **Getting there:** On-street charging bay on junction with Garnham Street/Garnham Close

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |
| J-1772 | 4 kW | 1 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** IER model 986 charge point

## Common questions

### How much does it cost to charge at Garnham Close (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at Garnham Close (Total Energies)?

Up to 7 kW AC via Type 2, J-1772.

### How many charging sockets does Garnham Close (Total Energies) have?

1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.

### Who operates Garnham Close?

Garnham Close is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Garnham Close (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Garnham Close (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Garnham Close (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Stamford Hill](https://ampmap.co.uk/chargers/united-kingdom/greater-london/stamford-hill)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [MFG BP Stamford Hill · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-mfg-bp-stamford-hill-uk) - CCS 50 kW, CHAdeMO 50 kW · 43-45 Stamford Hill
- [Yoakley Road · Total Energies](https://ampmap.co.uk/charger/total-energies-yoakley-road-uk) - Type 2 7 kW, J-1772 4 kW · Yoakley Road
- [ubitricity Distributed Energy Systems UK Ltd. 33 Dynevor Road](https://ampmap.co.uk/charger/ubitricity-33-dynevor-road-uk) - Ubitricity · Type 2 5 kW · 33 Dynevor Road · From 45p/kWh
- [Glyn Hopkin North London-Nissan · Nissan UK Dealer Network](https://ampmap.co.uk/charger/nissan-uk-dealer-network-glyn-hopkin-north-london-nissan-uk) - CHAdeMO 50 kW, Type 2 7 kW · 49-51 Stamford Hill
- [Stamford Hill · ESB Energy](https://ampmap.co.uk/charger/esb-energy-stamford-hill-uk) - CCS 50 kW, CHAdeMO 50 kW · 88 Stamford Hill
- [361 Amhurst Road · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-361-amhurst-road-uk) - CCS 50 kW · Hackney

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-garnham-close-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 27 Apr 2017).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
