# Gordon Road · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-gordon-road-uk

Gordon Road is an EV charging site in Wood Green, Greater London, run by Total Energies. It has a single 7 kW Type 2 socket.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 8 Gordon Road, N11 2PD
- **Area:** Wood Green, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.60764, -0.12632

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How fast is charging at Gordon Road (Total Energies)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Gordon Road (Total Energies) have?

1 charging socket: 1 × 7 kW Type 2.

### Who operates Gordon Road?

Gordon Road is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Gordon Road (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Gordon Road (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Gordon Road (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Wood Green](https://ampmap.co.uk/chargers/united-kingdom/greater-london/wood-green)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [Maidstone Road · Total Energies](https://ampmap.co.uk/charger/total-energies-maidstone-road-uk) - Type 2 7 kW · 11 Maidstone Road
- [ubitricity Distributed Energy Systems UK Ltd. 16 Warwick Road](https://ampmap.co.uk/charger/ubitricity-16-warwick-road-uk) - Ubitricity · Type 2 5 kW · 16 Warwick Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 58 Maidstone Road](https://ampmap.co.uk/charger/ubitricity-58-maidstone-road-uk) - Ubitricity · Type 2 5 kW · 58 Maidstone Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 25 Warwick Road](https://ampmap.co.uk/charger/ubitricity-25-warwick-road-uk) - Ubitricity · Type 2 5 kW · 25 Warwick Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 3 Natal Road](https://ampmap.co.uk/charger/ubitricity-3-natal-road-uk) - Ubitricity · Type 2 5 kW · 3 Natal Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 59 Shrewsbury Road](https://ampmap.co.uk/charger/ubitricity-59-shrewsbury-road-uk) - Ubitricity · Type 2 5 kW · 59 Shrewsbury Road · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-gordon-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Dec 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
