# Granville Gardens Car Park · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-granville-gardens-car-park-uk

Granville Gardens Car Park is an EV charging site in Norbury, Greater London, run by Total Energies. Both of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Granville Gardens, SW16 4EU
- **Area:** Norbury, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.41463, -0.12248
- **Getting there:** Charges may apply - refer to the owner of the parking bay for details.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Granville Gardens Car Park (Total Energies)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Granville Gardens Car Park (Total Energies)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Granville Gardens Car Park (Total Energies) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates Granville Gardens Car Park?

Granville Gardens Car Park is on the Total Energies network. For site issues, the operator lists 0845 850 0653.

### How long does a Tesla Model Y Long Range take to charge at Granville Gardens Car Park (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Granville Gardens Car Park (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Granville Gardens Car Park (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Norbury](https://ampmap.co.uk/chargers/united-kingdom/greater-london/norbury)
- [Cheapest charging in Norbury](https://ampmap.co.uk/chargers/united-kingdom/greater-london/norbury/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [Hepworth Road · ESB Energy](https://ampmap.co.uk/charger/esb-energy-hepworth-road-uk) - CHAdeMO 50 kW, Type 2 50 kW · 1 Hepworth Road (off Streatham High Rd)
- [Pod Point Norbury Railway Station](https://ampmap.co.uk/charger/pod-point-norbury-station-uk) - Type 2 7 kW · Norbury Avenue Norbury · From 60p/kWh
- [Opposite 15 Craignish Avenue · Char.gy](https://ampmap.co.uk/charger/char-gy-opposite-15-craignish-avenue-uk) - Type 2 5 kW · Opposite 15 Craignish Avenue
- [Abingdon Road · Believ](https://ampmap.co.uk/charger/believ-abingdon-road-uk) - Type 2 22 kW · Abingdon Road
- [Hatch Road · Believ](https://ampmap.co.uk/charger/believ-hatch-road-uk) - Type 2 7 kW · Hatch Road
- [ubitricity Distributed Energy Systems UK Ltd. 122 Semley Road](https://ampmap.co.uk/charger/ubitricity-122-semley-road-uk) - Ubitricity · Type 2 5 kW · 122 Semley Road · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-granville-gardens-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 5 Nov 2016).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
