Total Energies · EV charging site
Greenland Street, Camden
Greenland Street, Camden Town, NW1 0ND
Greenland Street, Camden is an EV charging site in Camden Town, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 153 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Camley Street (BP Pulse), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 7 Oct 2019)
- Notes
- Pod-Point Model PP_2111, 7kw side is faulty. Accepts any RFID. Although Source London branded, it does not appear on their maps.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Greenland Street, Camden (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Greenland Street, Camden (Total Energies)?
Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2, J-1772.
How many charging sockets does Greenland Street, Camden (Total Energies) have?
2 charging sockets: 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates Greenland Street, Camden?
Greenland Street, Camden is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Greenland Street, Camden (Total Energies)?
Camley Street (BP Pulse) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Greenland Street, Camden (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Greenland Street, Camden (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Greenland Street, Camden (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Plender Street
- ubitricity Distributed Energy Systems UK Ltd. 91 Albert Street
- Arlington Road
- ubitricity Distributed Energy Systems UK Ltd. 114 College Place
- ubitricity Distributed Energy Systems UK Ltd. 71 Albert Street
- ubitricity Distributed Energy Systems UK Ltd. 65A Albert Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 91 Albert Street · 45p per kWh · 5 kW · 0.2 mi
- Fastest nearby
- Plender Street · 22 kW · 0.2 mi