# Greenland Street, Camden · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-greenland-street-camden-uk

Greenland Street, Camden is an EV charging site in Camden Town, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Greenland Street, NW1 0ND
- **Area:** Camden Town, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.53845, -0.14103

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |
| J-1772 | 4 kW | 1 | Not listed |
| BS1363 3 Pin 13 Amp | 3 kW | 1 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** Pod-Point Model PP\_2111, 7kw side is faulty. Accepts any RFID. Although Source London branded, it does not appear on their maps.

## Common questions

### How much does it cost to charge at Greenland Street, Camden (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at Greenland Street, Camden (Total Energies)?

Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2, J-1772.

### How many charging sockets does Greenland Street, Camden (Total Energies) have?

2 charging sockets: 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 7 kW Type 2, 1 × 4 kW J-1772.

### Who operates Greenland Street, Camden?

Greenland Street, Camden is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Greenland Street, Camden (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Greenland Street, Camden (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Greenland Street, Camden (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Camden Town](https://ampmap.co.uk/chargers/united-kingdom/greater-london/camden-town)
- [Cheapest charging in Camden Town](https://ampmap.co.uk/chargers/united-kingdom/greater-london/camden-town/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [Plender Street · Total Energies](https://ampmap.co.uk/charger/total-energies-plender-street-uk) - Type 2 22 kW · 73 Plender Street
- [ubitricity Distributed Energy Systems UK Ltd. 91 Albert Street](https://ampmap.co.uk/charger/ubitricity-91-albert-street-uk) - Ubitricity · Type 2 5 kW · 91 Albert Street · From 45p/kWh
- [Arlington Road · Total Energies](https://ampmap.co.uk/charger/total-energies-arlington-road-uk) - Type 2 22 kW · 49 Arlington Road
- [ubitricity Distributed Energy Systems UK Ltd. 114 College Place](https://ampmap.co.uk/charger/ubitricity-114-college-place-uk) - Ubitricity · Type 2 5 kW · 114 College Place · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 71 Albert Street](https://ampmap.co.uk/charger/ubitricity-71-albert-street-uk) - Ubitricity · Type 2 5 kW · 71 Albert Street · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 65A Albert Street](https://ampmap.co.uk/charger/ubitricity-65a-albert-street-uk) - Ubitricity · Type 2 5 kW · 65A Albert Street · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-greenland-street-camden-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Oct 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
