Total Energies · EV charging site
Grosvenor Square
38 Grosvenor Square, Soho, W1K 2QB
Grosvenor Square is an EV charging site in Soho, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 441 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Q-Park Park Lane Fleet Hub, Park Lane (BP Pulse), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 27 Oct 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Grosvenor Square (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Grosvenor Square (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Grosvenor Square (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Grosvenor Square?
Grosvenor Square is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Grosvenor Square (Total Energies)?
Q-Park Park Lane Fleet Hub, Park Lane (BP Pulse) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Grosvenor Square (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Grosvenor Square (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Grosvenor Square (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 45 Grosvenor Square
- ubitricity Distributed Energy Systems UK Ltd. upper grosvenor street, At or Outside 42
- ubitricity Distributed Energy Systems UK Ltd. 38 Upper Grosvenor Street
- ubitricity Distributed Energy Systems UK Ltd. 5 Grosvenor Square
- ubitricity Distributed Energy Systems UK Ltd. Upper Brook Street, Oustide 4
- ubitricity Distributed Energy Systems UK Ltd. 50 Upper Brook Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 45 Grosvenor Square · 56p per kWh · 5 kW · 80 yd