Total Energies · EV charging site
Haggerston Road
245 Haggerston Road, Bethnal Green, E8 4HT
Haggerston Road is an EV charging site at 245 Haggerston Road in Bethnal Green, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. Amp Map lists 1 other charge point named Haggerston Road in Bethnal Green. 198 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Hackney Council Bentley Road Car Park (GeniePoint), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 27 Apr 2017)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Haggerston Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Haggerston Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Haggerston Road (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772.
Who operates Haggerston Road?
Haggerston Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Haggerston Road (Total Energies)?
Hackney Council Bentley Road Car Park (GeniePoint) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Haggerston Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Haggerston Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Haggerston Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Haggerston Road
- Lavender Grove
- ubitricity Distributed Energy Systems UK Ltd. 94 Middleton Road
- ubitricity Distributed Energy Systems UK Ltd. 46 De Beauvoir Crescent, opp.
- ubitricity Distributed Energy Systems UK Ltd. 90 Lenthall Road
- Stamford Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 94 Middleton Road · 45p per kWh · 5 kW · 0.3 mi