# Hammersmith Grove · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-hammersmith-grove-uk

Hammersmith Grove is an EV charging site in Shepherds Bush, Greater London, run by Total Energies. Its 4 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Hammersmith Grove, W6 7EL
- **Area:** Shepherds Bush, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.49956, -0.22786

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 4 | Not listed |
| J-1772 | 4 kW | 4 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Hammersmith Grove (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at Hammersmith Grove (Total Energies)?

Up to 7 kW AC via Type 2, J-1772.

### How many charging sockets does Hammersmith Grove (Total Energies) have?

4 charging sockets: 4 × 7 kW Type 2, 4 × 4 kW J-1772.

### Who operates Hammersmith Grove?

Hammersmith Grove is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Hammersmith Grove (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hammersmith Grove (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Hammersmith Grove (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Shepherds Bush](https://ampmap.co.uk/chargers/united-kingdom/greater-london/shepherds-bush)
- [Cheapest charging in Shepherds Bush](https://ampmap.co.uk/chargers/united-kingdom/greater-london/shepherds-bush/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [ubitricity Distributed Energy Systems UK Ltd. Richford Street, Side 188 Hammersmith Grove](https://ampmap.co.uk/charger/ubitricity-188-richford-street-side-188-hammersmith-gro-uk) - Ubitricity · Type 2 5 kW · Richford Street, Side 188 Hammersmith Grove · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 192-194 Hammersmith Grove, O S 192 194](https://ampmap.co.uk/charger/ubitricity-192-194-hammersmith-grove-o-s-192-194-uk) - Ubitricity · Type 2 5 kW · 192-194 Hammersmith Grove, O S 192 194 · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. Street Richford, Junction With Grove Mews](https://ampmap.co.uk/charger/ubitricity-street-richford-junction-with-grove-mews-uk) - Ubitricity · Type 2 5 kW · Street Richford, Junction With Grove Mews · From 45p/kWh
- [Beauclerc Road · SureCharge](https://ampmap.co.uk/charger/surecharge-beauclerc-road-2-uk) - Type 2 5 kW · Beauclerc Road
- [ubitricity Distributed Energy Systems UK Ltd. 173-175 Hammersmith Grove, On W F Way O S No1](https://ampmap.co.uk/charger/ubitricity-road-benbow-j-o-hammersmith-grove-uk) - Ubitricity · Type 2 5 kW · 173-175 Hammersmith Grove, On W F Way O S No1 · From 45p/kWh
- [Hammersmith Grove · SureCharge](https://ampmap.co.uk/charger/surecharge-hammersmith-grove-9-uk) - Type 2 5 kW · Hammersmith Grove

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-hammersmith-grove-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 8 Nov 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
