Total Energies · EV charging site
Haverstock Hill Road
Haverstock Hill Road, Chalk Farm, NW3 2AT
Haverstock Hill Road is an EV charging site in Chalk Farm, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 198 other charging sites are listed within a mile, and the nearest site with 50 kW or more is [E-TAXI ONLY] Rosslyn Hill (BP Pulse), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 12 May 2019)
- Notes
- Elektrobay Classic charge point due to be replaced with IER model
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Haverstock Hill Road (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Haverstock Hill Road (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Haverstock Hill Road (Total Energies) have?
1 charging socket: 1 × 4 kW J-1772, 1 × 7 kW Type 2.
Who operates Haverstock Hill Road?
Haverstock Hill Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Haverstock Hill Road (Total Energies)?
[E-TAXI ONLY] Rosslyn Hill (BP Pulse) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Haverstock Hill Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Haverstock Hill Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Haverstock Hill Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Downside Crescent
- Upper Park Road
- ubitricity Distributed Energy Systems UK Ltd. 6 Howitt Road
- Lawn Road
- Belsize Grove
- ubitricity Distributed Energy Systems UK Ltd. 61 Glenmore Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 6 Howitt Road · 45p per kWh · 5 kW · 140 yd
- Fastest nearby
- Downside Crescent · 22 kW · 70 yd