Total Energies · EV charging site
"Here East" Car Park
Waterden Road, Stratford, E15 2EE
"Here East" Car Park is an EV charging site in Stratford, Greater London, run by Total Energies. All 12 of its sockets are 7 kW Type 2. 77 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Stratford International Car Park, London (Osprey Charging), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free. Parking fees apply.(from Open Charge Map, 12 Dec 2017)
- Getting there
- Level 1 of multi storey car park
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at "Here East" Car Park (Total Energies)?
The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.
How fast is charging at "Here East" Car Park (Total Energies)?
Up to 7 kW AC via Type 2.
How many charging sockets does "Here East" Car Park (Total Energies) have?
12 charging sockets: 12 × 7 kW Type 2.
Who operates "Here East" Car Park?
"Here East" Car Park is on the Total Energies network.
Where is the nearest charger with 50 kW or more to "Here East" Car Park (Total Energies)?
Stratford International Car Park, London (Osprey Charging) is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at "Here East" Car Park (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at "Here East" Car Park (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at "Here East" Car Park (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 29 White Post Lane
- ubitricity Distributed Energy Systems UK Ltd. 79 Cadogan Terrace, Opp.
- ubitricity Distributed Energy Systems UK Ltd. 86 Cadogan Terrace, Opp.
- ubitricity Distributed Energy Systems UK Ltd. Homer road
- ubitricity Distributed Energy Systems UK Ltd. 22 Homer Road
- ubitricity Distributed Energy Systems UK Ltd. 26 Wyke Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 29 White Post Lane · 55p per kWh · 5 kW · 0.4 mi