# "Here East" Car Park · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-here-east-car-park-uk

"Here East" Car Park is an EV charging site in Stratford, Greater London, run by Total Energies. All 12 of its sockets are 7 kW Type 2.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Waterden Road, E15 2EE
- **Area:** Stratford, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.54902, -0.02365
- **Getting there:** Level 1 of multi storey car park

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 12 | Not listed |

- **Price:** Free. Parking fees apply. (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at "Here East" Car Park (Total Energies)?

The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.

### How fast is charging at "Here East" Car Park (Total Energies)?

Up to 7 kW AC via Type 2.

### How many charging sockets does "Here East" Car Park (Total Energies) have?

12 charging sockets: 12 × 7 kW Type 2.

### Who operates "Here East" Car Park?

"Here East" Car Park is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at "Here East" Car Park (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at "Here East" Car Park (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at "Here East" Car Park (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Stratford](https://ampmap.co.uk/chargers/united-kingdom/greater-london/stratford)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [ubitricity Distributed Energy Systems UK Ltd. 29 White Post Lane](https://ampmap.co.uk/charger/ubitricity-29-white-post-lane-uk) - Ubitricity · Type 2 5 kW · 29 White Post Lane · From 39p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 79 Cadogan Terrace, Opp.](https://ampmap.co.uk/charger/ubitricity-79-cadogan-terrace-opp-uk) - Ubitricity · Type 2 5 kW · 79 Cadogan Terrace, Opp. · From 39p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 86 Cadogan Terrace, Opp.](https://ampmap.co.uk/charger/ubitricity-86-cadogan-terrace-opp-uk) - Ubitricity · Type 2 5 kW · 86 Cadogan Terrace, Opp. · From 39p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. Homer road](https://ampmap.co.uk/charger/ubitricity-22-homer-road-2-uk) - Ubitricity · Type 2 5 kW · Homer road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 22 Homer Road](https://ampmap.co.uk/charger/ubitricity-22-homer-road-uk) - Ubitricity · Type 2 5 kW · 22 Homer Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 26 Wyke Road](https://ampmap.co.uk/charger/ubitricity-26-wyke-road-uk) - Ubitricity · Type 2 5 kW · 26 Wyke Road · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-here-east-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 12 Dec 2017).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
