# Highgrove Pool · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-highgrove-pool-uk

Highgrove Pool is an EV charging site in Ruislip, Greater London, run by Total Energies. Both of its sockets are 7 kW Type 2.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Eastcote Road, HA4 8DZ
- **Area:** Ruislip, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.57799, -0.41803
- **Getting there:** At far end of car park near large oak tree. Pay and display car park.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 4 | Not listed |

- **Price:** Free. Parking fees apply (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Highgrove Pool (Total Energies)?

The listed price is Free. Parking fees apply. Prices can change, so check the price at the charger before you start.

### How fast is charging at Highgrove Pool (Total Energies)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Highgrove Pool (Total Energies) have?

2 charging sockets: 4 × 7 kW Type 2.

### Who operates Highgrove Pool?

Highgrove Pool is on the Total Energies network. For site issues, the operator lists 0845 850 0653.

### How long does a Tesla Model Y Long Range take to charge at Highgrove Pool (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Highgrove Pool (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Highgrove Pool (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Ruislip](https://ampmap.co.uk/chargers/united-kingdom/greater-london/ruislip)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [Hume Way · Total Energies](https://ampmap.co.uk/charger/total-energies-hume-way-uk) - Type 2 7 kW · Hume Way
- [Ruislip Lido · Total Energies](https://ampmap.co.uk/charger/total-energies-ruislip-lido-uk) - Type 2 7 kW · Resistor Road
- [Ruislip Gardens Underground Station - Taxi Charger · ESB Energy](https://ampmap.co.uk/charger/esb-energy-ruislip-gardens-underground-station-taxi-charger--uk) - CCS 50 kW, CHAdeMO 50 kW · West End Road
- [Shell Recharge Shell Little Waitrose Ickenham](https://ampmap.co.uk/charger/shell-recharge-shell-little-waitrose-ickenham-uk) - CCS / CHAdeMO 50 kW · B466, 55 High Rd, Ickenham, Uxbridge · From 89p/kWh
- [Aldi South Ruislip](https://ampmap.co.uk/charger/aldi-south-ruislip-uk) - Type 2 4 kW · 27 Tiptree Road
- [Coach and Horses · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-coach-and-horses-uk) - CCS / CHAdeMO / Type 2 50 kW · Coach and Horses, 1 High Road, Ickenham · From 89p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-highgrove-pool-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Nov 2016).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
