# Hill Rise · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-hill-rise-uk

Hill Rise is an EV charging site in Greenford, Greater London, run by Total Energies. Its 2 sockets reach up to 22 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 1 Hill Rise, UB6 8NZ
- **Area:** Greenford, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.54173, -0.34696

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 1 | Not listed |
| Type 2 | 7 kW | 4 | Not listed |
| J-1772 | 4 kW | 4 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Hill Rise (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at Hill Rise (Total Energies)?

Up to 22 kW AC via Type 2, J-1772.

### How many charging sockets does Hill Rise (Total Energies) have?

2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772, 2 × 7 kW Type 2, 2 × 4 kW J-1772, 1 × 22 kW Type 2.

### Who operates Hill Rise?

Hill Rise is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Hill Rise (Total Energies)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hill Rise (Total Energies)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Hill Rise (Total Energies)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Greenford](https://ampmap.co.uk/chargers/united-kingdom/greater-london/greenford)
- [Cheapest charging in Greenford](https://ampmap.co.uk/chargers/united-kingdom/greater-london/greenford/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [Ingram Way · Total Energies](https://ampmap.co.uk/charger/total-energies-ingram-way-uk) - Type 2 7 kW · Ingram Way
- [Shell Recharge Shell Roundabout](https://ampmap.co.uk/charger/shell-recharge-shell-roundabout-uk) - CCS / CHAdeMO 50 kW · 744-748 Greenford Road · From 89p/kWh
- [Segro Areas Auriol Dr YARD1 · ChargePoint](https://ampmap.co.uk/charger/chargepoint-segro-areas-auriol-dr-yard1-uk) - Type 2 22 kW · 439 Oldfield Ln N
- [Pod Point R&R Greenford Ltd](https://ampmap.co.uk/charger/pod-point-r-and-r-greenford-ltd-uk) - Type 2 7 kW · 428 Long Drive · From 75.6p/kWh
- [Reglan Way · Believ](https://ampmap.co.uk/charger/believ-reglan-way-uk) - Type 2 22 kW · Reglan Way
- [Segro Areas Met Park Com 2 · ChargePoint](https://ampmap.co.uk/charger/chargepoint-segro-areas-met-park-com-2-uk) - Type 2 22 kW · 25 Derby Rd

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-hill-rise-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Oct 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
