Total Energies · EV charging site
Hillfield Park
84 Hillfield Park Mews, Muswell Hill, N10 3QT
Hillfield Park is an EV charging site in Muswell Hill, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 34 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Summerland Gardens Car Park (BP Pulse), 160 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 1 Apr 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Hillfield Park (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Hillfield Park (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Hillfield Park (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Hillfield Park?
Hillfield Park is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Hillfield Park (Total Energies)?
Summerland Gardens Car Park (BP Pulse) is 160 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Hillfield Park (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hillfield Park (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hillfield Park (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Summerland Gardens Car Park
- Queens Avenue
- Opposite 8 Grand Avenue
- 35 Fortismere Avenue
- Shell Recharge Shell Muswell Hill
- Midhurst Avenue
- Cheapest nearby
- Shell Recharge Shell Muswell Hill · 89p per kWh · 180 kW · 0.4 mi
- Fastest nearby
- Shell Recharge Shell Muswell Hill · 180 kW · 0.4 mi