Total Energies · EV charging site
Hinde Street (on street)
Hinde Street, Soho, W1U 3BJ
Hinde Street (on street) is an EV charging site in Soho, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 434 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Q-Park Park Lane Fleet Hub, Park Lane (BP Pulse), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 9 Jun 2019)
- Getting there
- On corner with Mandeville Place
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Hinde Street (on street) (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Hinde Street (on street) (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Hinde Street (on street) (Total Energies) have?
2 charging sockets: 2 × 4 kW J-1772, 2 × 7 kW Type 2.
Who operates Hinde Street (on street)?
Hinde Street (on street) is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Hinde Street (on street) (Total Energies)?
Q-Park Park Lane Fleet Hub, Park Lane (BP Pulse) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Hinde Street (on street) (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hinde Street (on street) (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hinde Street (on street) (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 3 Manchester Square
- ubitricity Distributed Energy Systems UK Ltd. 25 Manchester Square
- Ubitricity 25 Manchester Square
- ubitricity Distributed Energy Systems UK Ltd. 23 Manchester Square
- ubitricity Distributed Energy Systems UK Ltd. 7 Manchester Square
- ubitricity Distributed Energy Systems UK Ltd. 1 Duke Street
- Cheapest nearby
- Ubitricity 25 Manchester Square · 44p per kWh · 5 kW · 60 yd