Total Energies · EV charging site
Holmes Road
88 Holmes Road, Chalk Farm, NW5 3AX
Holmes Road is an EV charging site in Chalk Farm, Greater London, run by Total Energies. It has a single 22 kW Type 2 socket. 211 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Reef Technology - Kentish Town (BP Pulse), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 7 Jun 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Holmes Road (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Holmes Road (Total Energies)?
Up to 22 kW AC via Type 2.
How many charging sockets does Holmes Road (Total Energies) have?
1 charging socket: 1 × 22 kW Type 2.
Who operates Holmes Road?
Holmes Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Holmes Road (Total Energies)?
Reef Technology - Kentish Town (BP Pulse) is 0.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Holmes Road (Total Energies)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Holmes Road (Total Energies)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Holmes Road (Total Energies)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Ryland Road
- Inkerman Road
- ubitricity Distributed Energy Systems UK Ltd. 40 Inkerman Road
- ubitricity Distributed Energy Systems UK Ltd. 26 Athlone Street
- ubitricity Distributed Energy Systems UK Ltd. 30 Athlone Street
- Reef Technology - Kentish Town
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 40 Inkerman Road · 56p per kWh · 5 kW · 160 yd
- Fastest nearby
- Reef Technology - Kentish Town · 150 kW · 0.2 mi