Total Energies · EV charging site
Honour Oak Road
185 Honour Oak Road, Perry Vale, SE23 3RP
Honour Oak Road is an EV charging site in Perry Vale, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 136 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Perry Vale Parking (BP Pulse), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 10 Jan 2020)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Honour Oak Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Honour Oak Road (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Honour Oak Road (Total Energies) have?
2 charging sockets: 2 × 4 kW J-1772, 2 × 7 kW Type 2, 2 × 4 kW J-1772, 2 × 7 kW Type 2.
Who operates Honour Oak Road?
Honour Oak Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Honour Oak Road (Total Energies)?
Perry Vale Parking (BP Pulse) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Honour Oak Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Honour Oak Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Honour Oak Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pearcefield Avenue Car Park
- 33 Wood Vale
- Wood Vale
- ubitricity Distributed Energy Systems UK Ltd. 17B Rojack Road, Junc. Rockbourne Road
- Perry Vale Parking
- 41 Melford Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 17B Rojack Road, Junc. Rockbourne Road · 56p per kWh · 5 kW · 0.3 mi
- Fastest nearby
- Perry Vale Parking · 50 kW · 0.3 mi