# Honour Oak Road · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-honour-oak-road-uk

Honour Oak Road is an EV charging site in Perry Vale, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 185 Honour Oak Road, SE23 3RP
- **Area:** Perry Vale, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.44201, -0.05760

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 4 | Not listed |
| J-1772 | 4 kW | 4 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Honour Oak Road (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at Honour Oak Road (Total Energies)?

Up to 7 kW AC via J-1772, Type 2.

### How many charging sockets does Honour Oak Road (Total Energies) have?

2 charging sockets: 2 × 4 kW J-1772, 2 × 7 kW Type 2, 2 × 4 kW J-1772, 2 × 7 kW Type 2.

### Who operates Honour Oak Road?

Honour Oak Road is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Honour Oak Road (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Honour Oak Road (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Honour Oak Road (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Perry Vale](https://ampmap.co.uk/chargers/united-kingdom/greater-london/perry-vale)
- [Cheapest charging in Perry Vale](https://ampmap.co.uk/chargers/united-kingdom/greater-london/perry-vale/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [Pearcefield Avenue Car Park · Total Energies](https://ampmap.co.uk/charger/total-energies-pearcefield-avenue-car-park-uk) - Type 2 7 kW, J-1772 4 kW · Pearcefield Avenue
- [33 Wood Vale · Char.gy](https://ampmap.co.uk/charger/char-gy-33-wood-vale-uk) - Type 2 5 kW · 33 Wood Vale
- [Wood Vale · Char.gy](https://ampmap.co.uk/charger/char-gy-wood-vale-uk) - Type 2 5 kW · Wood Vale
- [ubitricity Distributed Energy Systems UK Ltd. 17B Rojack Road, Junc. Rockbourne Road](https://ampmap.co.uk/charger/ubitricity-17b-rojack-road-junc-rockbourne-road-uk) - Ubitricity · Type 2 5 kW · 17B Rojack Road, Junc. Rockbourne Road · From 45p/kWh
- [Perry Vale Parking · BP Pulse](https://ampmap.co.uk/charger/chargemaster-perry-vale-parking-uk) - CCS 50 kW, CHAdeMO 50 kW · Forest Hill
- [41 Melford Road · Char.gy](https://ampmap.co.uk/charger/char-gy-41-melford-road-uk) - Type 2 5 kW · 41 Melford Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-honour-oak-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 10 Jan 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
