Total Energies · EV charging site
Horselydown Lane (South Of Gainsford Street)
Horselydown Lane (South Of Gainsford Street), Shadwell, SE1 2LJ
Horselydown Lane (South Of Gainsford Street) is an EV charging site in Shadwell, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 323 other charging sites are listed within a mile, and the nearest site with 50 kW or more is [E-TAXI ONLY] 76-80 Tower Bridge Road (BP Pulse), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Horselydown Lane (South Of Gainsford Street) (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Horselydown Lane (South Of Gainsford Street) (Total Energies) have?
2 charging sockets: 1 × 3 kW J-1772, 1 × 7 kW Type 2.
Who operates Horselydown Lane (South Of Gainsford Street)?
Horselydown Lane (South Of Gainsford Street) is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Horselydown Lane (South Of Gainsford Street) (Total Energies)?
[E-TAXI ONLY] 76-80 Tower Bridge Road (BP Pulse) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Horselydown Lane (South Of Gainsford Street) (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Horselydown Lane (South Of Gainsford Street) (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Horselydown Lane (South Of Gainsford Street) (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.