# Jemca Edgware Road · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-jemca-edgware-road-uk

Jemca Edgware Road is an EV charging site in Golders Green, Greater London, run by Total Energies. All 4 of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** The Hyde, NW9 6BH
- **Area:** Golders Green, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.58102, -0.24389
- **Getting there:** Charges may apply - refer to the owner of the parking bay for details.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 4 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** Chargemaster post. Polar Network cards accepted as well as Source London

## Common questions

### How much does it cost to charge at Jemca Edgware Road (Total Energies)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Jemca Edgware Road (Total Energies)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Jemca Edgware Road (Total Energies) have?

4 charging sockets: 4 × 7 kW Type 2.

### Who operates Jemca Edgware Road?

Jemca Edgware Road is on the Total Energies network. For site issues, the operator lists 0845 850 0653.

### How long does a Tesla Model Y Long Range take to charge at Jemca Edgware Road (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Jemca Edgware Road (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Jemca Edgware Road (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Golders Green](https://ampmap.co.uk/chargers/united-kingdom/greater-london/golders-green)
- [Cheapest charging in Golders Green](https://ampmap.co.uk/chargers/united-kingdom/greater-london/golders-green/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [hub\_l003001\_cs\_01 · Trojan Energy](https://ampmap.co.uk/charger/trojan-energy-hub-l003001-cs-01-uk) - Type 2 22 kW · Russell Road
- [Derwent Avenue · Total Energies](https://ampmap.co.uk/charger/total-energies-derwent-avenue-uk) - Type 2 22 kW · Derwent Avenue
- [hub\_l002801\_cs\_11 · Trojan Energy](https://ampmap.co.uk/charger/trojan-energy-hub-l002801-cs-11-uk) - Type 2 22 kW · Montagu Road
- [ubitricity Distributed Energy Systems UK Ltd. 12 Springfield Gardens](https://ampmap.co.uk/charger/ubitricity-12-springfield-gardens-uk) - Ubitricity · Type 2 5 kW · 12 Springfield Gardens · From 45p/kWh
- [hub\_l002501\_cs\_15 · Trojan Energy](https://ampmap.co.uk/charger/trojan-energy-hub-l002501-cs-15-uk) - Type 2 22 kW · Dartmouth Road
- [hub\_l002401\_cs\_07 · Trojan Energy](https://ampmap.co.uk/charger/trojan-energy-hub-l002401-cs-07-uk) - Type 2 22 kW · Bertram Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-jemca-edgware-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 15 Dec 2016).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
