Total Energies · EV charging site
Keswick Road
2G Keswick Road, Putney, SW15 2JF
Keswick Road is an EV charging site at 2G Keswick Road in Putney, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. Amp Map lists 1 other charge point named Keswick Road in Putney. 239 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Upper Richmond Road (ESB Energy), 60 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 23 Dec 2017)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Keswick Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Keswick Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Keswick Road (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Keswick Road?
Keswick Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Keswick Road (Total Energies)?
Upper Richmond Road (ESB Energy) is 60 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Keswick Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Keswick Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Keswick Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Upper Richmond Road
- Keswick Road
- ubitricity Distributed Energy Systems UK Ltd. 22 Portinscale Road
- ubitricity Distributed Energy Systems UK Ltd. 144 Disraeli Road
- ubitricity Distributed Energy Systems UK Ltd. 6 Manfred Road
- ubitricity Distributed Energy Systems UK Ltd. 109 Disraeli Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 22 Portinscale Road · 56p per kWh · 5 kW · 0.1 mi
- Fastest nearby
- Upper Richmond Road · 50 kW · 60 yd