Total Energies · EV charging site
Kilmorey Gardens
Kilmorey Gardens, Richmond, TW1 1PR
Kilmorey Gardens is an EV charging site in Richmond, Greater London, run by Total Energies. All 3 of its sockets are 7 kW Type 2. 127 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Oak Lane, 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.69 / kWh; Idle fee £0.05/min; Minimum fee £1.73; other tariffs available(from Open Charge Map, 15 Feb 2022)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Kilmorey Gardens (Total Energies)?
The listed price is £0.69 / kWh; Idle fee £0.05/min; Minimum fee £1.73; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Kilmorey Gardens (Total Energies)?
Up to 7 kW AC via Type 2.
How many charging sockets does Kilmorey Gardens (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2.
Who operates Kilmorey Gardens?
Kilmorey Gardens is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Kilmorey Gardens (Total Energies)?
Shell Recharge Shell Oak Lane is 0.9 miles away in a straight line, with up to 180 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Kilmorey Gardens (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Kilmorey Gardens (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Kilmorey Gardens (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 2 Heron Road, Junc. St. Margarets Road
- ubitricity Distributed Energy Systems UK Ltd. 325 St. Margarets Road, Junc. Kilmorey Road
- ubitricity Distributed Energy Systems UK Ltd. 359 St. Margarets Road
- ubitricity Distributed Energy Systems UK Ltd. 36 Napier Road, Outside No 36
- ubitricity Distributed Energy Systems UK Ltd. 227 St Margarets Road
- ubitricity Distributed Energy Systems UK Ltd. 55 Steele Road, Outside 55
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 2 Heron Road, Junc. St. Margarets Road · 56p per kWh · 5 kW · 100 yd