Total Energies · EV charging site
Kingsway Road Car Park
Kingsway Road Car Park, Sutton, SM3 8SL
Kingsway Road Car Park is an EV charging site in Sutton, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 20 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Sutton, 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available. Parking fees apply(from Open Charge Map, 27 Apr 2017)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Kingsway Road Car Park (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Parking fees apply. Prices can change, so check the price at the charger before you start.
How fast is charging at Kingsway Road Car Park (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Kingsway Road Car Park (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates Kingsway Road Car Park?
Kingsway Road Car Park is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Kingsway Road Car Park (Total Energies)?
Shell Recharge Shell Sutton is 0.8 miles away in a straight line, with up to 175 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Kingsway Road Car Park (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Kingsway Road Car Park (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Kingsway Road Car Park (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Kingsway Road Car Park (site 2)
- ubitricity Distributed Energy Systems UK Ltd. 150 Mulgrave Road
- ubitricity Distributed Energy Systems UK Ltd. 80 Alberta Avenue
- ubitricity Distributed Energy Systems UK Ltd. 114 Mulgrave Road
- ubitricity Distributed Energy Systems UK Ltd. 29 Saint James’s Road, Opp. Shell Station
- ubitricity Distributed Energy Systems UK Ltd. 16 Saint James Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 150 Mulgrave Road · 45p per kWh · 5 kW · 0.5 mi