Total Energies · EV charging site
Ladbroke Square
Ladbroke Square, Notting Hill, W11 3LX
Ladbroke Square is an EV charging site in Notting Hill, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 737 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Westbourne Park Road (ESB Energy), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 12 May 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Ladbroke Square (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Ladbroke Square (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Ladbroke Square (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates Ladbroke Square?
Ladbroke Square is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Ladbroke Square (Total Energies)?
Westbourne Park Road (ESB Energy) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Ladbroke Square (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ladbroke Square (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ladbroke Square (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 35 Ladbroke Grove, opp.
- ubitricity Distributed Energy Systems UK Ltd. 41 Ladbroke Grove
- ubitricity Distributed Energy Systems UK Ltd. 26 Ladbroke Grove
- ubitricity Distributed Energy Systems UK Ltd. 8 Lansdowne Walk
- ubitricity Distributed Energy Systems UK Ltd. 9 Lansdowne Walk
- Kensington Park Gardens
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 35 Ladbroke Grove, opp. · 67p per kWh · 5 kW · 60 yd
- Fastest nearby
- Kensington Park Gardens · 22 kW · 140 yd