Total Energies · EV charging site
Lancaster Gate
14 Lancaster Gate, Bayswater, W2 3LH
Lancaster Gate is an EV charging site in Bayswater, Greater London, run by Total Energies. It has a single 22 kW Type 2 socket. 718 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lancaster Gate (Spire House), Bayswater (ESB Energy), 150 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 7 Oct 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lancaster Gate (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Lancaster Gate (Total Energies)?
Up to 22 kW AC via Type 2.
How many charging sockets does Lancaster Gate (Total Energies) have?
1 charging socket: 1 × 22 kW Type 2.
Who operates Lancaster Gate?
Lancaster Gate is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Lancaster Gate (Total Energies)?
Lancaster Gate (Spire House), Bayswater (ESB Energy) is 150 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lancaster Gate (Total Energies)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lancaster Gate (Total Energies)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lancaster Gate (Total Energies)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. lancaster gate, Opposite 107
- ubitricity Distributed Energy Systems UK Ltd. 15 Lancaster Gate
- ubitricity Distributed Energy Systems UK Ltd. lancaster gate, At or Outside 100
- ubitricity Distributed Energy Systems UK Ltd. 21 Lancaster Gate
- ubitricity Distributed Energy Systems UK Ltd. lancaster gate, Near corus hotel
- ubitricity Distributed Energy Systems UK Ltd. 24 Lancaster Gate
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. lancaster gate, Opposite 107 · 67p per kWh · 5 kW · 10 yd