Total Energies · EV charging site
Lancaster Grove
Opposite 35 Lancaster Grove, Chalk Farm, NW3 4EX
Lancaster Grove is an EV charging site in Chalk Farm, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 304 other charging sites are listed within a mile, and the nearest site with 50 kW or more is [E-TAXI ONLY] Rosslyn Hill (BP Pulse), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 30 May 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lancaster Grove (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Lancaster Grove (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Lancaster Grove (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates Lancaster Grove?
Lancaster Grove is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Lancaster Grove (Total Energies)?
[E-TAXI ONLY] Rosslyn Hill (BP Pulse) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lancaster Grove (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lancaster Grove (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lancaster Grove (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 25 Lancaster Grove
- ubitricity Distributed Energy Systems UK Ltd. 47 Belsize Park Gardens
- ubitricity Distributed Energy Systems UK Ltd. 58 Eton Avenue
- ubitricity Distributed Energy Systems UK Ltd. 15 Adamson Road
- ubitricity Distributed Energy Systems UK Ltd. 12 Belsize Park Gardens
- ubitricity Distributed Energy Systems UK Ltd. 59 Belsize Park Gardens
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 25 Lancaster Grove · 56p per kWh · 5 kW · 70 yd