# Langley Leisure Centre · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-langley-leisure-centre-uk

Langley Leisure Centre is an EV charging site in Slough, run by Total Energies. Its 6 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Parlaunt Road, SL3 8BD
- **Area:** Slough, United Kingdom
- **Coordinates (latitude, longitude):** 51.49939, -0.53618
- **Getting there:** Left at the entrance to car park

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 6 | Not listed |
| BS1363 3 Pin 13 Amp | 3 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** Chargemaster post 684. Source London and Polar Network cards accepted

## Common questions

### How much does it cost to charge at Langley Leisure Centre (Total Energies)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Langley Leisure Centre (Total Energies)?

Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.

### How many charging sockets does Langley Leisure Centre (Total Energies) have?

6 charging sockets: 6 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.

### Who operates Langley Leisure Centre?

Langley Leisure Centre is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Langley Leisure Centre (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Langley Leisure Centre (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Langley Leisure Centre (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Slough](https://ampmap.co.uk/chargers/united-kingdom/slough/slough)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [The Centre Car Park · Total Energies](https://ampmap.co.uk/charger/total-energies-the-centre-car-park-uk) - Type 2 7 kW, BS1363 3 Pin 13 Amp 3 kW · Farnham Road
- [Heathrow/Windsor Marriott Hotel · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-heathrow-windsor-marriott-hotel-uk) - NACS 16 kW · Ditton Road
- [48 Barton Road](https://ampmap.co.uk/charger/48-barton-road-uk) - Type 2 7 kW, J-1772 7 kW · Barton Road
- [Red Lion (Langley) · evyve](https://ampmap.co.uk/charger/evyve-red-lion-langley-uk) - CCS 75 kW · 1 St Mary's Rd · From 85p/kWh
- [Red Lion (Iver) · evyve](https://ampmap.co.uk/charger/evyve-the-red-lion-pub-and-dining-uk) - CCS 75 kW, CHAdeMO 75 kW · Langley Park Road 12 · From 85p/kWh
- [Iver Recreation Ground Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-iver-recreation-ground-car-park-uk) - Type 2 7 kW · Iver Recreation Ground Car Park, High Street · From 65p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-langley-leisure-centre-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 30 Jul 2018).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
