Total Energies · EV charging site
Lennox Gardens
11 Lennox Gardens, Chelsea, SW1X 0DB
Lennox Gardens is an EV charging site in Chelsea, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 362 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Symons Street (BP Pulse), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 12 May 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lennox Gardens (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Lennox Gardens (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Lennox Gardens (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates Lennox Gardens?
Lennox Gardens is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Lennox Gardens (Total Energies)?
Symons Street (BP Pulse) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lennox Gardens (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lennox Gardens (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lennox Gardens (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 3 Lennox Gardens
- ubitricity Distributed Energy Systems UK Ltd. 53 Pont Street
- ubitricity Distributed Energy Systems UK Ltd. 24 Walton Street
- Walton Street
- ubitricity Distributed Energy Systems UK Ltd. 14 Walton Street
- ubitricity Distributed Energy Systems UK Ltd. 45 Lennox Gardens, opp. 45
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 3 Lennox Gardens · 56p per kWh · 5 kW · 50 yd
- Fastest nearby
- Walton Street · 22 kW · 120 yd