Total Energies · EV charging site
Lion Gate Gardens
8 Lion Gate Gardens, Richmond, TW9 2DW
Lion Gate Gardens is an EV charging site in Richmond, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 126 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Ultra Rapid EV Charging - Sainsbury's Richmond (Smart Charge by Sainsbury's), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 1 Apr 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lion Gate Gardens (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Lion Gate Gardens (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Lion Gate Gardens (Total Energies) have?
2 charging sockets: 2 × 4 kW J-1772, 2 × 7 kW Type 2, 2 × 4 kW J-1772, 2 × 7 kW Type 2.
Who operates Lion Gate Gardens?
Lion Gate Gardens is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Lion Gate Gardens (Total Energies)?
Ultra Rapid EV Charging - Sainsbury's Richmond (Smart Charge by Sainsbury's) is 0.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lion Gate Gardens (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lion Gate Gardens (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lion Gate Gardens (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 1 Lion Gate Gardens, Opp.
- ubitricity Distributed Energy Systems UK Ltd. Lions Gate Gardens , Junc. Kew Road
- ubitricity Distributed Energy Systems UK Ltd. 19 Lion Gate Gardens, Opp.
- ubitricity Distributed Energy Systems UK Ltd. 22 Gainsborough Road
- ubitricity Distributed Energy Systems UK Ltd. 46 Raleigh Road
- ubitricity Distributed Energy Systems UK Ltd. Castlegate s/o 8 St Pauls Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 1 Lion Gate Gardens, Opp. · 56p per kWh · 5 kW · 70 yd