Total Energies · EV charging site
Lion Road Car Park
Lion Road, Edmonton, N9 9DU
Lion Road Car Park is an EV charging site in Edmonton, Greater London, run by Total Energies. It has a single 7 kW Type 2 socket, and charging is listed as free. 58 other charging sites are listed within a mile, and the nearest site with 50 kW or more is LEAP24 Charging Point (Leap24 (NL)), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 3 Nov 2016)
- Phone (from Open Charge Map)
- 0845 850 0653
- Notes
- 10 pounds per year for Source London membership
- Getting there
- 24 hrs
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lion Road Car Park (Total Energies)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Lion Road Car Park (Total Energies)?
Up to 7 kW AC via Type 2.
How many charging sockets does Lion Road Car Park (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Lion Road Car Park?
Lion Road Car Park is on the Total Energies network. For site issues, the operator lists 0845 850 0653.
Where is the nearest charger with 50 kW or more to Lion Road Car Park (Total Energies)?
LEAP24 Charging Point (Leap24 (NL)) is 0.5 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lion Road Car Park (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lion Road Car Park (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lion Road Car Park (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 19 Kingston Road
- ubitricity Distributed Energy Systems UK Ltd. 52 Chiswick Road
- ubitricity Distributed Energy Systems UK Ltd. 6 Marsden Road
- ubitricity Distributed Energy Systems UK Ltd. 35 Marsden Road
- ubitricity Distributed Energy Systems UK Ltd. 42 Monmouth Road
- ubitricity Distributed Energy Systems UK Ltd. 11 Nelson Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 19 Kingston Road · 56p per kWh · 5 kW · 0.2 mi