Total Energies · EV charging site
Lots Road
Lots Road, Fulham, SW10 0AB
Lots Road is an EV charging site in Fulham, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 805 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Oakley street (BP Pulse), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 12 May 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lots Road (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Lots Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Lots Road (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates Lots Road?
Lots Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Lots Road (Total Energies)?
Oakley street (BP Pulse) is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lots Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lots Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lots Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 49 Upcerne Road
- ubitricity Distributed Energy Systems UK Ltd. 62 Uverdale Road
- ubitricity Distributed Energy Systems UK Ltd. 45A Upcerne Road
- ubitricity Distributed Energy Systems UK Ltd. 31A Tadema Road
- ubitricity Distributed Energy Systems UK Ltd. 43 Tetcott Road
- ubitricity Distributed Energy Systems UK Ltd. 35A Tetcott Road, opp.
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 49 Upcerne Road · 67p per kWh · 5 kW · 80 yd