Total Energies · EV charging site
Melrose Avenue
173 Melrose Avenue, Earlsfield, SW19 8AU
Melrose Avenue is an EV charging site at 173 Melrose Avenue in Earlsfield, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. Amp Map lists 1 other charge point named Melrose Avenue in Earlsfield. 204 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge EV Waitrose - Wimbledon, 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 8 Jan 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Melrose Avenue (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Melrose Avenue (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Melrose Avenue (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772.
Who operates Melrose Avenue?
Melrose Avenue is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Melrose Avenue (Total Energies)?
Shell Recharge EV Waitrose - Wimbledon is 0.9 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Melrose Avenue (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Melrose Avenue (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Melrose Avenue (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 204 Heythorp Street, Opp.
- Revelstoke Road
- Normanton Avenue
- ubitricity Distributed Energy Systems UK Ltd. 173 Clonmore Street
- ubitricity Distributed Energy Systems UK Ltd. 153 Clonmore Street
- ubitricity Distributed Energy Systems UK Ltd. 140 Clonmore Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 204 Heythorp Street, Opp. · 56p per kWh · 5 kW · 90 yd