Total Energies · EV charging site
Mill Lane
9 Mill Lane, Kilburn, NW6 1NT
Mill Lane is an EV charging site in Kilburn, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 247 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 1-6 Christchurch Avenue, 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 12 May 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Mill Lane (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Mill Lane (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Mill Lane (Total Energies) have?
1 charging socket: 1 × 4 kW J-1772, 1 × 7 kW Type 2.
Who operates Mill Lane?
Mill Lane is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Mill Lane (Total Energies)?
1-6 Christchurch Avenue is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Mill Lane (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mill Lane (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Mill Lane (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- St Cutherberts Road
- Gondar Gardens
- 2 Camden/Mill Lane (site
- ubitricity Distributed Energy Systems UK Ltd. 33 Ravenshaw Street
- ubitricity Distributed Energy Systems UK Ltd. 40 Ravenshaw Street
- ubitricity Distributed Energy Systems UK Ltd. 4 Minster Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 33 Ravenshaw Street · 56p per kWh · 5 kW · 0.1 mi
- Fastest nearby
- St Cutherberts Road · 22 kW · 0.1 mi