Total Energies · EV charging site
Nassau Road
5 Nassau Road, Barnes, SW13 9QD
Nassau Road is an EV charging site in Barnes, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 142 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Outside 5-13 Grantham Road (BP Pulse), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 1 Apr 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Nassau Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Nassau Road (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Nassau Road (Total Energies) have?
2 charging sockets: 2 × 4 kW J-1772, 2 × 7 kW Type 2, 2 × 4 kW J-1772, 2 × 7 kW Type 2.
Who operates Nassau Road?
Nassau Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Nassau Road (Total Energies)?
Outside 5-13 Grantham Road (BP Pulse) is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Nassau Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nassau Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Nassau Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. opp 21 The Crescent
- ubitricity Distributed Energy Systems UK Ltd. opp 29 The Crescent
- ubitricity Distributed Energy Systems UK Ltd. Lowther Road, Junc. Nassau Road
- Station Road
- ubitricity Distributed Energy Systems UK Ltd. 42 Cleveland Road, Junc. Station Road
- ubitricity Distributed Energy Systems UK Ltd. Gerard Road s/o 2 Lowther Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. opp 21 The Crescent · 56p per kWh · 7 kW · 100 yd