# NCP Hounslow West Station · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-ncp-hounslow-west-station-uk

NCP Hounslow West Station is an EV charging site in Heston, Greater London, run by Total Energies. Its 5 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Bath Road, TW3 3DH
- **Area:** Heston, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.47253, -0.38489
- **Getting there:** Parking fees apply - refer to the owner of the parking bay for details. Hours accessible: 24 hrs

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 5 | Not listed |
| J-1772 | 4 kW | 5 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available. Parking fees apply. (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at NCP Hounslow West Station (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Parking fees apply.. Prices can change, so check the price at the charger before you start.

### How fast is charging at NCP Hounslow West Station (Total Energies)?

Up to 7 kW AC via J-1772, Type 2.

### How many charging sockets does NCP Hounslow West Station (Total Energies) have?

5 charging sockets: 5 × 4 kW J-1772, 5 × 7 kW Type 2.

### Who operates NCP Hounslow West Station?

NCP Hounslow West Station is on the Total Energies network. For site issues, the operator lists 0845 850 0653.

### How long does a Tesla Model Y Long Range take to charge at NCP Hounslow West Station (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at NCP Hounslow West Station (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at NCP Hounslow West Station (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Heston](https://ampmap.co.uk/chargers/united-kingdom/greater-london/heston)
- [Cheapest charging in Heston](https://ampmap.co.uk/chargers/united-kingdom/greater-london/heston/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [Hounslow-West Station Car Park · ESB Energy](https://ampmap.co.uk/charger/esb-energy-hounslow-west-station-car-park-uk) - CHAdeMO 50 kW, Type 2 50 kW · Hounslow-West Station Car Park,Bath Road, Hounslow
- [ubitricity Distributed Energy Systems UK Ltd. 22 Standard Road, Outside 22](https://ampmap.co.uk/charger/ubitricity-22-standard-road-outside-22-uk) - Ubitricity · Type 2 5 kW · 22 Standard Road, Outside 22 · From 45p/kWh
- [Standard Road · SureCharge](https://ampmap.co.uk/charger/surecharge-standard-road-4-uk) - Type 2 5 kW · Standard Road
- [Bath Road · Total Energies](https://ampmap.co.uk/charger/total-energies-bath-road-uk) - Type 2 22 kW, Type 2 7 kW · Bath Road
- [Standard Road · SureCharge](https://ampmap.co.uk/charger/surecharge-standard-road-5-uk) - Type 2 5 kW · Standard Road
- [ubitricity Distributed Energy Systems UK Ltd. 89 Standard Road, Outside 89](https://ampmap.co.uk/charger/ubitricity-89-standard-road-outside-89-uk) - Ubitricity · Type 2 5 kW · 89 Standard Road, Outside 89 · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-ncp-hounslow-west-station-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 27 Apr 2017).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
