Total Energies · EV charging site
North End Road
North End Road, Fulham, W14 0TL
North End Road is an EV charging site in Fulham, Greater London (W14 0TL), run by Total Energies. Its 4 sockets reach up to 7 kW, with Type 2 at the top speed. Amp Map lists 5 other charge points named North End Road in Fulham. 1,381 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Superstore - Kensington, 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 4 Dec 2017)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at North End Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at North End Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does North End Road (Total Energies) have?
4 charging sockets: 4 × 7 kW Type 2, 4 × 4 kW J-1772.
Who operates North End Road?
North End Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to North End Road (Total Energies)?
Pod Point Tesco Superstore - Kensington is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at North End Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at North End Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at North End Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 107 Edith Road
- North End Crescent
- Ubitricity 8 North End Crescent, Opposite No 8
- ubitricity Distributed Energy Systems UK Ltd. 8 North End Crescent, Opposite No 8
- ubitricity Distributed Energy Systems UK Ltd. 28 North End Crescent, Opposite 28
- ubitricity Distributed Energy Systems UK Ltd. 90 Trevanion Road, Side Of 90 Edith Road
- Cheapest nearby
- Ubitricity 8 North End Crescent, Opposite No 8 · 55p per kWh · 5 kW · 80 yd