Total Energies · EV charging site
Park Row Car Park
Park Row Car Park, Greenwich, SE10 9NL
Park Row Car Park is an EV charging site in Greenwich, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 149 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Trafalgar SF Connect (BP Pulse), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 17 Oct 2019)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Park Row Car Park (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Park Row Car Park (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Park Row Car Park (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772, 2 × 7 kW Type 2, 2 × 4 kW J-1772.
Who operates Park Row Car Park?
Park Row Car Park is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Park Row Car Park (Total Energies)?
Trafalgar SF Connect (BP Pulse) is 0.1 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Park Row Car Park (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Park Row Car Park (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Park Row Car Park (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Trafalgar SF Connect
- Lassell Street
- ubitricity Distributed Energy Systems UK Ltd. Saunders Ness Road Opposite School Ground
- ubitricity Distributed Energy Systems UK Ltd. 40 Saunders Ness Road
- ubitricity Distributed Energy Systems UK Ltd. Saunders Ness Road Col. 8
- ubitricity Distributed Energy Systems UK Ltd. Saunders Ness Road Col. 7
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 40 Saunders Ness Road · 55p per kWh · 5 kW · 0.4 mi
- Fastest nearby
- Trafalgar SF Connect · 150 kW · 0.1 mi