Total Energies · EV charging site
Pembridge Crescent
14 Pembridge Crescent, Notting Hill, W11 3DU
Pembridge Crescent is an EV charging site in Notting Hill, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 22 kW. 757 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Westbourne Park Road (ESB Energy), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 30 May 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pembridge Crescent (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Pembridge Crescent (Total Energies)?
Up to 22 kW AC via J-1772, Type 2.
How many charging sockets does Pembridge Crescent (Total Energies) have?
1 charging socket: 1 × 4 kW J-1772, 1 × 7 kW Type 2, 1 × 22 kW Type 2.
Who operates Pembridge Crescent?
Pembridge Crescent is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Pembridge Crescent (Total Energies)?
Westbourne Park Road (ESB Energy) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pembridge Crescent (Total Energies)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pembridge Crescent (Total Energies)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pembridge Crescent (Total Energies)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 12 Denbigh Road
- ubitricity Distributed Energy Systems UK Ltd. 24 Ledbury Road
- ubitricity Distributed Energy Systems UK Ltd. 76 Kensington Park Road
- ubitricity Distributed Energy Systems UK Ltd. 41 Pembridge Villas, opp.
- ubitricity Distributed Energy Systems UK Ltd. 44 Kensington Park Gardens
- Dawson Place
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 12 Denbigh Road · 67p per kWh · 5 kW · 100 yd