Total Energies · EV charging site
Penge East Station
Station Road, Perry Vale, SE20 7BQ
Penge East Station is an EV charging site in Perry Vale, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 15 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Maple Road (BP Pulse), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available. Parking fees apply.(from Open Charge Map, 27 Apr 2017)
- Phone (from Open Charge Map)
- 0845 850 0653
- Getting there
- Charges may apply - refer to the owner of the parking bay for details.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Penge East Station (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Parking fees apply.. Prices can change, so check the price at the charger before you start.
How fast is charging at Penge East Station (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Penge East Station (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772.
Who operates Penge East Station?
Penge East Station is on the Total Energies network. For site issues, the operator lists 0845 850 0653.
Where is the nearest charger with 50 kW or more to Penge East Station (Total Energies)?
Maple Road (BP Pulse) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Penge East Station (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Penge East Station (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Penge East Station (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Penge East Station (site 2)
- Maple Road
- ubitricity Distributed Energy Systems UK Ltd. 43 Venner Road
- Pod Point Ancaster Nissan Penge
- Clevedon Road
- ubitricity Distributed Energy Systems UK Ltd. 17 Watlington Grove
- Cheapest nearby
- Pod Point Ancaster Nissan Penge · Free · 7 kW · 0.6 mi
- Fastest nearby
- Maple Road · 50 kW · 0.2 mi