Total Energies · EV charging site
Preston Road Car Park
Preston Road, Brent, HA3 0QB
Preston Road Car Park is an EV charging site in Brent, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free. 13 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Garage - Harrow (GeniePoint), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 29 Sept 2016)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Preston Road Car Park (Total Energies)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Preston Road Car Park (Total Energies)?
Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.
How many charging sockets does Preston Road Car Park (Total Energies) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.
Who operates Preston Road Car Park?
Preston Road Car Park is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Preston Road Car Park (Total Energies)?
Shell Garage - Harrow (GeniePoint) is 0.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Preston Road Car Park (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Preston Road Car Park (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Preston Road Car Park (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 7 Vista Way
- ubitricity Distributed Energy Systems UK Ltd. 87 Vista Way
- Windermere Avenue
- ubitricity Distributed Energy Systems UK Ltd. 42 Edison Drive
- ubitricity Distributed Energy Systems UK Ltd. 34 The Avenue
- ubitricity Distributed Energy Systems UK Ltd. 23 The Avenue
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 7 Vista Way · 45p per kWh · 5 kW · 0.4 mi