Total Energies · EV charging site
Priory Road 157
Opposite 157 Priory Road, Muswell Hill, N8 8NA
Priory Road 157 is an EV charging site in Muswell Hill, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 33 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Hornsey Park Road, 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 1 Apr 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Priory Road 157 (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Priory Road 157 (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Priory Road 157 (Total Energies) have?
3 charging sockets: 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Priory Road 157?
Priory Road 157 is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Priory Road 157 (Total Energies)?
Shell Recharge Shell Hornsey Park Road is 0.4 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Priory Road 157 (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Priory Road 157 (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Priory Road 157 (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Linzee Road
- Shell Recharge Shell Hornsey Park Road
- Glasslyn Road
- Rectory Gardens
- Summerland Gardens Car Park
- Middle Lane
- Cheapest nearby
- Shell Recharge Shell Hornsey Park Road · 89p per kWh · 300 kW · 0.4 mi
- Fastest nearby
- Shell Recharge Shell Hornsey Park Road · 300 kW · 0.4 mi