Total Energies · EV charging site
Purley Railway station
Approach road, Purley, CR8 2UD
Purley Railway station is an EV charging site in Purley, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Extra - Purley, 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 15 Dec 2017)
- Phone (from Open Charge Map)
- 020 7247 4114
- Notes
- Charging restricted at night. Pod-Point model PP_2151 charge point.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Purley Railway station (Total Energies)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Purley Railway station (Total Energies)?
Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.
How many charging sockets does Purley Railway station (Total Energies) have?
3 charging sockets: 3 × 3 kW BS1363 3 Pin 13 Amp, 2 × 7 kW Type 2.
Who operates Purley Railway station?
Purley Railway station is on the Total Energies network. For site issues, the operator lists 020 7247 4114.
Where is the nearest charger with 50 kW or more to Purley Railway station (Total Energies)?
Pod Point Tesco Extra - Purley is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Purley Railway station (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Purley Railway station (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Purley Railway station (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- High Street
- Whytecliffe Road South
- Pod Point Tesco Extra - Purley
- Russell Hill Road
- Pampisford Road
- Brighton Road
- Cheapest nearby
- Pod Point Tesco Extra - Purley · 44.4p per kWh · 50 kW · 0.2 mi
- Fastest nearby
- Pod Point Tesco Extra - Purley · 50 kW · 0.2 mi