# Purley Railway station · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-purley-railway-station-uk

Purley Railway station is an EV charging site in Purley, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Approach road, CR8 2UD
- **Area:** Purley, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.33770, -0.11417

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |
| BS1363 3 Pin 13 Amp | 3 kW | 3 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** Charging restricted at night. Pod-Point model PP\_2151 charge point.

## Common questions

### How much does it cost to charge at Purley Railway station (Total Energies)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Purley Railway station (Total Energies)?

Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.

### How many charging sockets does Purley Railway station (Total Energies) have?

3 charging sockets: 3 × 3 kW BS1363 3 Pin 13 Amp, 2 × 7 kW Type 2.

### Who operates Purley Railway station?

Purley Railway station is on the Total Energies network. For site issues, the operator lists 020 7247 4114.

### How long does a Tesla Model Y Long Range take to charge at Purley Railway station (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Purley Railway station (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Purley Railway station (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Purley](https://ampmap.co.uk/chargers/united-kingdom/greater-london/purley)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [High Street · Total Energies](https://ampmap.co.uk/charger/total-energies-high-street-uk) - Type 2 7 kW · High Street
- [Whytecliffe Road South · Believ](https://ampmap.co.uk/charger/believ-whytecliffe-road-south-uk) - Type 2 22 kW · Whytecliffe Road South
- [Pod Point Tesco Extra - Purley](https://ampmap.co.uk/charger/pod-point-tesco-extra-purley-uk) - CCS / CHAdeMO 50 kW, Type 2 7 kW · 8 Purley Rd Purley · From 44.4p/kWh
- [Russell Hill Road · ESB Energy](https://ampmap.co.uk/charger/esb-energy-russell-hill-road-uk) - CHAdeMO 50 kW, Type 2 50 kW · Russell Hill Road
- [Pampisford Road · Total Energies](https://ampmap.co.uk/charger/total-energies-pampisford-road-uk) - Type 2 7 kW · 30 Pampisford Road
- [Brighton Road](https://ampmap.co.uk/charger/brighton-road-uk) - CCS 50 kW, CHAdeMO 50 kW · 116 Brighton Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-purley-railway-station-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 15 Dec 2017).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
